Filter

Pavement Asset Management (Aug 1995)

Highways Members Only

Pavement performance audits have also assisted engineers to analyse vast amounts of data relating to the performance of various traffickable roads in the municipality. Assessing different rehabilitation or reconstruction strategies requires an understanding of the costs and longevity of different pavement types and treatments. Since rigid pavements outlast flexible pavements,...

Stabilisation Plant Operating In Australia (Nov 1981)

Highways Members Only

Stabilisation, already widely used in road pavements in Australia, is being increasingly specified by engineers in three general areas: (a) To improve the engineering properties of sub- grade materials. (b) To modify or strengthen locally available materials which are often of a marginal quality in a situation of diminishing availability...

Performance Of Concrete Pavements On Major Nsw Roads (Nov 1990)

Highways Members Only

In recent years there has been a significant increase in the construction of concrete (rigid) pavements in NSW on both major highways and urban, municipal networks. Concrete roads have been constructed in configurations varying from two—lane carriageways to six-lane, dual-carriageway formations. Three major, heavily trafficked roads on which concrete pavements...

Overview Of Xxth World Road Congress (Dec 1995)

Highways Members Only

About 2700 delegates attended the five-day Congress which consisted of plenary sessions, committee reports and technical tours. The Association’s national infra— structure engineer attended the Congress to assess the relevance of new road technology for Australia. The Congress was organised by PIARC (a more detailed explanation of PIARC can be...

Major Concrete Road Construction For Nsw In 1982 (Mar 1982)

Highways Members Only

Signfcant changes in the costs and availability of key resources, which began to occur in the 1970s and are continuing in the 1980s, together with reassessments of the effects of traffic loads, particularly heavy traffic, are seeing reviews of the types of pavements and their design by road authorities in...

Recycling Flood-Damaged Roads By Cement Stabilisation (Jul 1990)

Highways Members Only

During 1990 large inland areas of Queensland and New South Wales were devastated by severe floods. Considerable media attention was devoted to the effect of these floods on people and their property. Evacuation, flood-relief oDerations and subseauent rehabilitation of towns damaged by the floods were widely reported. One element of...

Australian Pavement Research The Last 20 Years (Mar 1996)

Highways Members Only

The road transport system is a valuable and essential part of Australia’s infrastructure in which we all have an enormous stake. However, infrastructure is a long- term investment in the future and consequently receives little attention from the public unless something goes wrong or individually, we are affected by delays...

Melbournes New Concrete Road (Dec 1976)

Highways Members Only

Construction of a major concrete road is nearing completion at South Melbourne, for the Country Roads Board, Victoria. The total area of pavement is nearly 70,000 square metres, equivalent to 19 lane Kilometer of roadway. The road forms the southern and northern approaches to the new bridge over the Yarra...

100000 Sqm Of Pavement Recycling By Cement Stabilisation Brisbane (Jun 1982)

Highways Members Only

The Brisbane City Council operates a Pavement Management System for the identification of the pave- ment needs of the City’s 4400 km of roads. Roads with failed areas exceeding 20 per cent and in need of rehabilitation are identified by this system. One of the rehabilitation methods adopted for roads...

Flinders Highway Pavement Recycling South Australia (Sep 1991)

Highways Members Only

Until the last few years the main use of pavement rehabilitation by recycling the existing pavement by cement stabilisation had been in urban roads administered by Local Government. The existing pavement thicknesses and therefore the depths of pavement recycling in these applications are typically 150—200 mm. Using similar procedures the...

Grand Avenue Camellia – Parramatta Citys Latest Concrete Road (March 1977)

Highways Members Only

We favour the finish-and-forget concrete pavement where it can be economically justified , said Parramatta Council‘s Chief Engineer, Mr. Fred Smale. Parramatta Council has now been using concrete pavements long enough to know that, in the long term, they save money. Not onIy does Council save on maintenance, but road...

Slipformed Concrete Pavement For Pacific Highway Queensland (Nov 1982)

Highways Members Only

The Main Roads Department, Queensland recently awarded a contract for the construction of 3.25 km of two- lane concrete pavement on the Pacific Highway near Burleigh Heads. This project, which forms part of the programmed extension of the highway in the area skirting Queensland's Gold Coast Figure 1, will be...