Concrete, which has withstood all the loads on heavily used roads for many decades, can be used again as a concrete aggegrate in road pavement construction after undergoing appropriate treatment. The example of four pavement batches prepared by 2 different companies in 1992 and 1993 on the A27 motorway m...
The Reuse of Old Pitch Containing Asphalt in Cement Bound Base Courses Depending on the Level of Harmful Substances
Large quantities of old asphalt containing varying admixtures of tar/pitch are produced during the renewal of asphalt roads. These pitches contain environmentally relevant substances such as pnlyr.yr.lic aromatic hydrocarbons (PAHs) and phenols which must not be allowed to leach out into the ground water. The intention is to bind the...
Concrete Made of Building Demolition Waste
In the field of research on secondary materials, an experimental study on the re-use of building demolition waste has been conducted. These materials will be used in Italy, further to decree-laws and regulations, drawn in compliance with the rules of the Community Law 1 9 w93h, ich has already been...
Retreating Pavements on Site with Cement – The Test Site at Messancy (Belgium)
Waste disposal is a serious problem for local authorities and the search for alternative solutions which allow for reusing is necessary. rin public works on roads or sewer systems,new techniques, new types of materials and new approaches are coming to the front, including the consideration of "environmental costs" besides technical...
Development of a Test to Compare Anti-Reflective Cracking Treatments
In Spain, like in other European countries, during the last twenty years roads constructed with cement bound base layers have had many maintenance problems due to reflective cracking. It is impossible to know the effectiveness of the new treatments which are applied as anti-reflective cracking measures. Therefore a laboratory test...
Study on the Meclidilical Behaviour of Precast Concrete Pavements
Precast concrete pavements (PCCP) are constructed by placing small size precast concrete slabs on the subbase. In this paper, the loading and warping stresses are discussed based on the results of the experiment and FEM analysis. A test pavement was constructed using 1 - 3 m size and 150 mm...
Early Trafficking of Concrete Pavements – Practical Experience
Fast track paving has been a daily routine in Vienna since the early 80ies. To meet the requirements for opening to traffic (flexural strength at least 3.85 N/mm 2 ) quickly, super-plasticized concrete with a w/c-ratio below 0.42 is used and opened to traffic the second day after placing. If...
Development of a Prectrnssing Method for Joints of Precast Prestressed Concrete Pavement Slabs
As precast prestressed concrete pavement slabs with high strength are resistant to abrasion and enable fast construction, they have been increasingly used in Japan instead of the conventional pavements, especially in heavy traffic roads and airfields. 1-lowever, in precast prestressed concrete slab pavements with plenty of dowelled joints, pumping and...
Use of Fast Track Concrete Construction in the USA
Fast track concrete pavement technology provides alternatives that can meet the public's demand for quick access to quality pavements. Fast track concrete pavement construction entails any method of accelerating construction. Some changes in tradicional use and consideration of certain aspects ot concrete pavement construction accompany fast track. However, fast track...
Application of One Day Concrete for Pavements
In order to shorten the construction periods of concrete structures, PWRI and four cement manufacturers carried out a joint research to develop 5 new types of one-day concrete with the following requirements: The compressive strength of the concrete shall be 30 N/mm 2 or more one day after mixing as...
A CRCP Inlay for the Rehabilitation of a Deteriorated Concrete Pavement on a Motorway with Very Heavy Traffic
Short description of the rehabilitation works on the most heavily trafficked motorway in Belgium.
Thin Steel Fiber Reinforced Concrete Overlays and Inlays
Between 1982 aiid 1989, 8 thin overlay test sections were constructed with a total surface area of 129.000 m2 . The relevant research project is carried out with a view to the necessary future renovation of part of the Belgium road network. All sections were built with 10 to 12...