ASCP Presentation 001 Conference Overture John Hodgkinson ASCP Paper 01 ASCP Presentation 01 Construction of the New Silk Road (Western China to Western Europe Transport Corridor) David Dash ASCP Paper 02 Key Components in Long Term Sustainability of Concrete Pavement Systems Dan Zollinger ASCP Presentation 02 Sustainability Considerations for PCC...
Oberon Thin Concrete Pavement 2 years on; from design to construction
This paper presents a review of the thin concrete pavement system that was constructed for a fuel station in Oberon NSW, from design through to construction and a look at the pavement performance following over two years of service.At the ASCP Conference at Coffs Harbour in 2015, Juan Pablo Covarrubias...
Combined Reinforcing – The Right Solution for Container Parks and Other Heavy Duty Pavements
Combined Reinforcing is fast becoming recognised and proven as the right solution for Container Parks and other Heavy Duty Pavements. In these sorts of pavements the first areas that are prone to breaking down or requiring maintenance under the very high loads that are being applied are often the joints...
Northern Connector, South Australia’s Political Journey
The concrete paving of the North-South Corridor, Norther Connector in South Australia was as much a political challenge as it was a logistical and technical one. George Panagopoulos, DPTI Project Manager, outlines the unique political journey to achieving the Project's successful inception and completion.
Northern Connector – The paving journey for the first concrete pavement in Adelaide
During the Northern Connector tender, concrete pavements was discussed early as an option. Our concrete pavement solution became Lendlease’s primary submission with flexible pavement as an alternative as it provided increased local content and introduced new skills for the region. Following contract award, immediate planning for detailed jointing design, raw...
Construction of the M4 Widening, WestConnex Stage 1A
The M4 Widening project comprised the first stage in the delivery of WestConnex. It involved the widening and upgrading of approximately 7.5 kilometres of the M4 Motorway (M4) between Pitt Street, Parramatta and Homebush Bay Drive, Homebush. The project was opened to traffic in July 2017, in line with the...
Development of Performance Curves for Thin Bonded Concrete Overlays on Asphalt in Minnesota24
Bonded concrete overlays on asphalt (BCOA), historically known as whitetoppings, are growing in popularity as an option for rehabilitating distressed asphalt pavements. Despite their application over the past several decades, the existence of performance models for this type of pavement are rare. It was the objective of this study to...
Use of Fast Set Concrete For Concrete Pavement Maintenance Work
The advent of the new generation of volumetric concrete mixers in conjunction with the availability of calcium sulfoaluminate cements has transformed concrete pavement maintenance practice around the world and especially in the United States, Canada and South Africa and in NSW where there is a history of 8 years’ experience...
Recent Advances and Uses of Roller Compacted Concrete for Pavement Construction in the United States
Roller Compacted Concrete (RCC) is a no slump concrete that is placed by an asphalt paver and compacted with vibratory rollers similar to asphalt pavement construction. RCC has long history of good performance as a pavement for ports, container yards, and manufacturing plants. This paper will summarize a recent survey...
Major Concrete Pavement Rehabilitation by Rapid Slab Replacement. Pacific Motorway Queensland
Rehabilitation of concrete road pavements by rapid slab replacement in single shifts has been established in Australia for ten years. Until recently it has been used for spot replacement of slabs in both road and airport applications. In South East Queensland in 2013, a program over a series of 22...
Developments in Rapid Set Lean Concrete Subbase
The technology and practice for single shift high strength concrete base replacement, mainly at night, using rapid set concrete has been established in Australia for ten years. Since 2017 this technology has now been adapted and extended to developing a rapid set lean concrete and related registered mixes. This has...
Characterization of joint sealants through an innovative test procedure
Joint sealants are indispensable components of Jointed Plain Concrete Pavements (JPCP), the standard construction method in Germany. The joint filling system is subjected to various loads during their service life, which in practice lead to a regular renewal of the sealing after about 7 -10 years. Nevertheless, it must be...