Innovation Allowing More Paving Time….and less of everything else

Presentation by John Eisenhour from ASCP 3rd Concrete Pavements Conference 2015

On a typical cut up concrete paving project, there can be more time spent on width change, maneuvering (walking around the site) and mobilization (loading preparation, loading and unloading, transport) than actual paving! This presentation from G&Z (Guntert & Zimmerman) highlight recent innovations focused on dramatically reducing the time required for activities other than paving!